Near · Pennsylvania · Chester County
9 data centers proposed or permitted within 25 miles of West Whiteland Township, PA
2 permitted · 0 under review · 7 announced — from the public permit record, not press releases. Distances are straight-line from the center of West Whiteland Township.
The sites, nearest first
Project Forge Data Center (Sentinel Green Fig LLC)
2 issued, 1 expected of 3 permits on record.
No figure verified from a document yet.
1205 Commonwealth Dr. Data Center (former Pennhurst Asylum)
1 expected of 1 permit on record.
No figure verified from a document yet.
PECO - Limerick Distribution Project (67 MW)
1 under review, 1 issued of 2 permits on record.
No figure verified from a document yet.
2201, 2301, 2501, 2701, & 2901 Renaissance Blvd. Data Center (MLP Ventures)
1 expected of 1 permit on record.
No figure verified from a document yet.
3200 Horizon Dr. Data Center (MLP Ventures)
1 expected of 1 permit on record.
No figure verified from a document yet.
411 Swedeland Rd. Data Center (MLP Ventures)
1 expected of 1 permit on record.
No figure verified from a document yet.
2100 Renaissance Blvd. Data Center (MLP Ventures)
1 expected of 1 permit on record.
No figure verified from a document yet.
600 River Rd. Data Center (MLP Ventures)
1 expected of 1 permit on record.
No figure verified from a document yet.
900 Conshohocken Rd. Data Center (MLP Ventures)
1 expected of 1 permit on record.
No figure verified from a document yet.
Nearby places
- Exton, PA — 0.9 mi away · 9 sites
- Lionville, PA — 2.4 mi away · 9 sites
- Uwchlan Township, PA — 3.3 mi away · 9 sites
- East Caln Township, PA — 3.3 mi away · 9 sites
- Frazer, PA — 3.3 mi away · 9 sites
- East Whiteland Township, PA — 3.7 mi away · 9 sites
What you can do
Open a project on the map. If a comment period is open, the record shows the deadline under Permit. The Pennsylvania Bulletin notice linked as the primary document names the DEP regional office (Southeast, Northeast, Southcentral, Northcentral, Southwest, or Northwest) and the contact to send written comments to; comments must arrive within the 30-day window. You can ask DEP for a public hearing in the same comment. This site is independent and is not affiliated with DEP or any company named on it.
The full dataset as CSV and JSON: Data access.
"Permitted" means at least one permit of any type is issued; "under review" means an application is filed or noticed and no permit is issued yet; "announced" means the record anticipates permits but none is filed. None of this says anything is being built. Counts reflect the ledger sheet as of October 2026; absence here means we have not identified a project from public records, not that none exists.